電力電纜排管質量缺陷與防治詳解

山東電纜橋架廠家給大家整理了電力電纜排管質量缺陷與防治方法,希望那個對大家有所幫助!
Shandong Cable Bridge Frame Manufacturer has sorted out the quality defects and prevention methods of power cable piping, hoping that it will be helpful to you all! 
1.問題:基槽開挖內部積水
1. Problem: Water accumulation in foundation trench excavation
隱患:基坑積水浸泡后,地基土質變軟,承載力降低其,引起管渠基礎下沉,造成管渠結構折裂損壞
Hidden danger: After the foundation pit is immersed in water, the foundation soil becomes soft and the bearing capacity decreases, which causes the subsidence of the foundation of the pipeline and canal, and causes the fracture and damage of the structure of the pipeline and canal.
原因分析:1)自然降水或其它落水流進基槽,造成積水;
Reason analysis: 1) Natural precipitation or other falling water flows into the foundation trough, causing water accumulation;
2)地下水、滯水,未采取排降、降水措施
2) Groundwater, stagnant water, no drainage and precipitation measures
預防措施:1)雨季施工,須將基槽周邊開挖排水溝,防止落水流入槽內;
Preventive measures: 1) In rainy season construction, drainage ditches should be excavated around the foundation trench to prevent water falling into the trench;
2)排水溝應接通原排水管網,開槽宜在枯水期施工;
2) Drainage ditches should be connected to the original drainage network, and grooving should be constructed in dry season.
3)在地下水位以下或有淺層滯水地段挖槽,應采用排水溝、集水井、井點排降水措施;
3) Drainage ditches, catchment wells and well-point drainage measures should be adopted to dig ditches below the groundwater level or in shallow water-holding areas.
4)按照設計要求做好放坡施工
4) Sloping construction according to design requirements
山東電纜橋架
2.問題:排管不整齊,回填不規范
2. Problem: Unorderly drainage and irregular backfilling
隱患:管道擠壓變形,降低使用壽命
Hidden danger: pipe extrusion deformation, reduce service life
原因分析:1)未按照設計、規范施工;
Reason analysis: 1) Failure to comply with design and specification of construction;
2)回填土用雜物回填
2) Sundries Backfilling for Backfilling
3)質量管理不到位,工程驗收不細致。
3) The quality management is not in place and the project acceptance is not meticulous.
預防措施:1)嚴格按照作業指導書、規范施工
Preventive measures: 1) Construction in strict accordance with operation instructions and specifications
2)按規范整齊安裝排管,并進行固定;
2) Install and fix the pipes neatly according to the specifications;
3)回填前應坑內積水、雜物等,回填土應每300mm夯實一次,后必須培出高于地面300mm的防沉層
3) Water and debris in the pit should be removed before backfilling. The backfill should be compacted every 300 mm. Finally, the Anti-subsidence layer 300 mm above the ground must be cultivated.
好了,今天的內容就先給大家介紹到這里了,收藏山東電纜橋架廠家官網:http://www.euup.cn,可以了解更多詳細信息!
Okay, today's content will be introduced to you first, collect the official website of Shandong Cable Bridge Manufacturer: http://www.euup.cn, you can learn more details!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 在线观看国产一区二区三区 | 日本暖暖视频在线播放 | 欧美午夜不卡在线观看最新 | 久久精品成人免费看 | 伊人热久久 | 久草在线免费播放 | 国产第一福利影院 | 一个人看的免费观看日本视频www | 免费狼人久久香蕉网 | 久久视频在线播放视频99re6 | 国产午夜精品久久久久九九 | 欧美性另类69xxxx极品 | 久久久久在线观看 | 国产亚洲欧美在线播放网站 | 国内精自品线一区91 | 一级毛片在线完整免费观看 | 久久久国产精品福利免费 | 一级成人毛片免费观看欧美 | 日韩毛片在线免费观看 | 女人张开腿让男人捅视频 | 日本欧美视频 | 成人在线免费 | 天堂素人搭讪系列嫩模在线观看 | 亚洲综合网在线观看 | 久草久草在线视频 | 日韩美女视频网站 | 亚洲综合亚洲综合网成人 | 92午夜国产福利视频1000 | 久久精品国产亚洲综合色 | 亚洲天堂视频网 | 久久九九精品视频 | 免费日韩在线视频 | 国产精品三级 | 成人在线欧美 | 性欧美精品久久久久久久 | 欧美aaaaaabbbbb | 91小视频在线观看免费版高清 | 精品一区视频 | 夜鲁夜鲁夜鲁在线观看福利 | 九九精品视频在线播放8 | 爽爽在线 |