成人免费片-成人免费动作大片黄在线-成人免费在线-成人免费在线网站-欧美亚洲在线观看-欧美亚洲在线视频

網站公告-NOTICE
聯系我們
濟南航豐實業有限公司

電話:15168870138
聯系人:龐經理

網址:http://www.euup.cn  

廠址: 德州市禹城市莒鎮產業園26棟

經銷商地址:天橋區建華五金市場東區5-1  

魯ICP備09095923號-1

新聞資訊

當前位置:首頁 / 新聞資訊

濟南電纜橋架的電纜如何有層次擺放?

橋架對于一些修建施工的人來說并不生疏,它在咱們的日子中扮演著比較重要的人物,只要合理有序的組織才干更好的確保全體的。那么濟南電纜橋架上的電纜是怎么有層次的擺放的呢?接下來咱們就為我們做簡略的剖析。
The bridge is not unfamiliar to some people who build it. It plays an important role in our lives. Only a reasonable and orderly organization can better ensure the safety of all. So how does the cable on Jinan cable bridge have layered arrangement? Next let's do a brief analysis for us.
濟南電纜橋架
Ji'nan cable tray
1.濟南電纜橋架層次擺放應是弱電流操控電纜在上層,接著是一般操控電纜,低壓動力電纜、高壓動力電纜依次往下擺放。這種擺放有利于屏蔽干擾、電力電纜冷卻、便于施工。
1. The layers of Jinan cable bridge should be the top layer of weak current control cable, followed by general control cable, low voltage power cable and high voltage power cable in turn. This arrangement is conducive to shielding interference, power cable cooling and easy construction.
2.各層電纜橋架層間的間隔為:
2. the interval between each cable bridge deck is as follows:
操控電纜≥200mm
Control cable is more than 200mm
動力電纜≥300mm
Power cable is more than 300mm
機械化敷設電纜≥400mm
The mechanized laying cable is more than 400mm
山東電纜橋架
注意事項:
Matters needing attention:
1.XQJ型電纜橋架設備的大載荷、支撐間隔應小于答應載荷和支撐跨距。
The maximum load and support interval of 1.XQJ cable bridge equipment should be less than the promised load and supporting span.
2.挑選電纜橋架的寬度時應留有必定的備用空位,以便為往后增加電纜用。
2. when selecting the width of the cable tray, there must be a certain reserve space to increase the cable for the future.
3.當電力電纜和操控電纜較少時,可用一電纜橋架設備,但要用隔板將電力電纜和操控電纜離隔敷設。
3. When there are fewer power cables and control cables, a cable bridge can be used, but the center of the cables and control cables are separated by diaphragms.
4.電纜橋架水平敷設時,橋架之間的銜接接頭應盡量設置在跨距的1/4左右處.水平走向的電纜每隔2米左右固定一下,垂直走向的電纜每個1.5米左右固定一下。
4. When laying the cable bridge horizontally, the joints between the bridges should be set at about 1/4 of the span as far as possible. Horizontal cable should be fixed every 2 meters, vertical cable should be fixed every 1.5 meters.
5.電纜橋架莊子應有牢靠接地。如間隔的電纜橋架每隔30-50米接地一次。
5. cable bridge Chuang-tzu should be firmly grounded. For example, the span of the cable tray will be grounded once every 30-50 meters.
6.電纜橋架設備除需屏蔽裝保護罩外,在室外設備時應在其加裝保護罩,避免日曬、雨淋。對如需焊接設備時,焊接四周的焊縫厚度不得小于母材的厚度,焊口有必要防腐處理。
6. In addition to shielding protection cover, cable bridge equipment should be installed on the top of the outdoor equipment to avoid sunshine and rain. If the welding equipment is needed, the thickness of the weld around the welding should not be less than the thickness of the base metal, so it is necessary to treat the weld corrosion.
(文章由:濟南航豐實業有限公司提供,對山東電纜橋架感興趣趣的朋友可以關注我們http://www.euup.cn,我們將為您提供新的新聞)
(The article is provided by Jinan Hanfeng Industry Co., Ltd. Anyone who is interested in Shandong cable bridge can pay attention to us at http://www.euup.cn. We will provide you with the latest news.)
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 亚洲精品不卡午夜精品 | 97在线碰碰观看免费高清 | 国产一级一片免费播放视频 | 国产精品亚洲一区在线播放 | 色丁香久久 | 国产91精品一区二区 | 久草视频播放 | aaa大片| 毛片三级 | 啪视| 成人高清毛片a | 成人午夜兔费观看网站 | 一级a美女毛片 | 一级欧美一级日韩毛片99 | 亚洲精品亚洲人成人网 | 国产高清在线精品一区二区三区 | 亚洲欧美久久精品1区2区 | 精品一区二区三区在线观看l | 久久成人精品 | 欧美一级色视频 | 久久www免费人成_看片高清 | 久草免费小视频 | 中文字幕一区二区三区久久网站 | aaa一级毛片| 免费成年人在线观看视频 | 欧美日韩亚洲综合在线一区二区 | japonensis国产福利| 免费一级大片 | 久久最新 | 国内自拍视频在线播放 | 日本加勒比在线视频 | 久久国产精品女 | 精品无码一区在线观看 | 中文无线乱码二三四区 | 国产午夜伦伦伦午夜伦 | 国内精品一区二区 | 亚洲一区二区三区首页 | 精品日韩一区二区三区视频 | 国产三级精品久久三级国专区 | 日韩美女一级毛片a | 黄网免费 |