成人免费片-成人免费动作大片黄在线-成人免费在线-成人免费在线网站-欧美亚洲在线观看-欧美亚洲在线视频

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://www.euup.cn  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

山東電纜橋架選擇安裝注意事項(xiàng)

  山東電纜橋架選擇安裝注意事項(xiàng):
  Shandong cable tray selection installation note:
  1.電纜橋架的大載荷、支撐間距應(yīng)小于允許載荷和支撐跨距。
  The maximum load, 1 cable tray support spacing should be less than the allowable load and support span.
  2.橋架的安裝應(yīng)以規(guī)范為準(zhǔn),目前可參照《電纜橋架安裝圖集86SD169》進(jìn)行。橋架在安裝過程中嚴(yán)禁載人,如現(xiàn)場情況確有必要時,必須有保障設(shè)施方可載人,本事項(xiàng)對于不合格或非的操作人員尤為重要。
  2 bridge should be installed in the national standards, the reference to "86SD169" of cable tray installation atlas. Bridge in the installation process is strictly prohibited manned, such as the scene when necessary, must have the safety protection facilities shall be manned, this for the unqualified or non professional personnel is very important.
  3.橋架的立柱、托臂等支架可與基礎(chǔ)預(yù)埋件焊接固定,也可采用膨脹螺栓固定,對于現(xiàn)場焊接處一定要做好防腐處理,通常由用戶現(xiàn)場涂刷防腐漆。
  The column, the bracket can be fixed with 3 bridge welding based embedded parts, also can use expansion bolts, the welding place should be well treated, usually by the user site besmear brushs anticorrosive paint.
  4.電纜橋架水平敷設(shè)時,橋架間的對接處距支承點(diǎn)的距離應(yīng)在跨距的1/4以內(nèi),對于大跨距橋架好放在支承架上對接,在有彎通或三通的地方則需單獨(dú)增加支承點(diǎn),垂直方向的托臂每隔1.5m設(shè)一固定點(diǎn)。
  4 cable bridge horizontal laying, the distance of supporting points should be in 1 / 4 span bridge within the joint between the distance, it is better for large span bridge connection on the supporting frame, were individually increases the supporting point in a general or three place, perpendicular to the direction of the bracket is provided with a fixed interval of 1.5m.
  5.橋架內(nèi)的電纜應(yīng)用電纜卡帶、或金屬電纜卡子進(jìn)行分組固定。對于水平敷設(shè)的電纜通常每隔2m左右作一固定點(diǎn);對于垂直敷設(shè)的電纜應(yīng)每隔1—1.5m固定一次,在改變標(biāo)高的端部也應(yīng)予以固定。
  Cable cable cassette, or metal cable clip 5 group fixed tray. For laying cable level usually every 2m around a fixed point; the cable lifting should be every 1 1.5m fixed time, in the end changes should also be fixed.
  6.電纜橋架按電力施工規(guī)范要求應(yīng)進(jìn)行良好接地,對于鍍鋅電纜橋架無須有專門接地裝置,其本體即可作為接地干線;對于表面進(jìn)行非金屬處理的橋架則必須有專門的接地裝置;橋架的接地線可用VV-16mm2電纜或等截面的銅編織線,該線通常由用戶自備,如由本廠供貨,則應(yīng)在合同中注明,長距離的電纜橋架每隔30—50m接地一次。
  6 cable tray should be a good grounding in electric power construction specifications, for galvanized cable tray without special grounding device, which can be used as a grounding line; for the surface of non metal bridge must have ground special equipment; bridge ground be used VV-16mm2 cable or section of the copper braided wire, the line is owned by the user, such as by the factory delivery, it should be noted in the contract, the long distance cable tray every 30 50m grounding once.
  以上就是山東電纜橋架公司發(fā)布,如果還有什么疑問,歡迎來電咨詢!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 九九免费在线视频 | 日韩一级影院 | 久久精品国产精品亚洲综合 | 国产日韩精品在线 | 国产手机国产手机在线 | 久久国产免费观看精品1 | 久久久精品久久久久久久久久久 | 免费观看久久 | 美国一级大黄香蕉片 | 日本大黄网站 | 欧美三级网站在线观看 | 精品国产看高清国产毛片 | 性a爱片免费视频性 | 免费人成激情视频在线观看冫 | 高清一级毛片 | 久草免费在线播放 | 成人性视频在线 | 日韩一级片网址 | 中文字幕乱码视频32 | 91大神在线精品视频一区 | 久久成人动漫 | 国内久久久久影院精品 | 一级毛片韩国 | 久久久久久国产精品免费免费 | a级精品九九九大片免费看 a级毛片免费观看网站 | 欧美国产精品不卡在线观看 | 国产在线观看一区 | 成年片人免费www | 国产成人精品综合久久久 | 中文字幕亚洲综合久久男男 | 精品国产一区二区三区四区vr | 国产成人免费在线观看 | 欧美一级成人影院免费的 | 日本a级三级三级三级久久 日本a级特黄三级三级三级 | 精品综合久久久久久99 | 91av综合| 久久久久久一品道精品免费看 | 加勒比色综合久久久久久久久 | 99视频在线精品 | 一色屋成人免费精品网 | 欧美精品高清在线观看 |