成人免费片-成人免费动作大片黄在线-成人免费在线-成人免费在线网站-欧美亚洲在线观看-欧美亚洲在线视频

網站公告-NOTICE
聯系我們
濟南航豐實業有限公司

電話:15168870138
聯系人:龐經理

網址:http://www.euup.cn  

廠址: 德州市禹城市莒鎮產業園26棟

經銷商地址:天橋區建華五金市場東區5-1  

魯ICP備09095923號-1

新聞資訊

當前位置:首頁 / 新聞資訊

電纜橋架安裝在不同場合如何接地

在我們使用橋架的過程中,根據其安裝的場合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?下面我們為您整理相關內容。
In the process of using the bridge, the grounding methods are different according to the different installation occasions. Do you know what grounding methods are used respectively? Now we'll sort out the relevant contents for you.
在我們使用橋架的過程中,根據其安裝的場合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?
In the process of using the bridge, the grounding methods are different according to the different installation occasions. Do you know what grounding methods are used respectively?
橋架可能存在的安裝場合以及如何接地的情況有以下三種:
There are three possible installation occasions and grounding conditions of the bridge:
1、當允許利用橋架系統構成接地干線回路時,橋架端部之間連接電阻應不大于0.00033歐姆 ,接地孔應絕緣涂層。在1KV及以下中性點直接接地系統中,受電設備的接地與系統中性線接地相連。
1. When it is allowed to use the bridge system to form the grounding trunk circuit, the connection resistance between the ends of the bridge should not be greater than 0.00033 ohm, and the insulation coating should be removed from the grounding hole. In the 1kV and below neutral point direct grounding system, the grounding of the power receiving equipment is connected with the neutral line grounding of the system.
2、裝有處動切斷供電裝軒時,橋架的級長方向金屬橫截面積應不小于規定值。沿橋架全長另敷設接地干線時,每段(包括非直線 段)橋架應少有一點與接地干線可靠連接。
2. When installing the power cut-off device, the metal cross-sectional area in the level direction of the bridge should not be less than the specified value. When another grounding main line is laid along the whole length of the bridge, at least one point of each section (including non-linear section) of the bridge shall be reliably connected with the grounding main line.
3、對于振動場所,橋架不同的安裝場合的接地要點說明:在接地部位的連接處應裝置彈簧圈。
3. For vibration sites, the key points of grounding for different installation sites of the bridge: spring rings should be installed at the connection of the grounding parts.
電纜橋架之間可利用連接板作為跨接線,把橋架連成一體。在連接板兩端的兩只連接螺栓上加鍍鋅彈簧墊圈,橋架之間用軟銅線進行跨接,再將橋架與接地線相連,形成電氣通路。橋架整體與接地干線應有不少于兩處的連接。接地作業完成后需要檢查驗收。
Connecting plates can be used as jumpers between cable trays to connect the trays into one. Galvanized spring washers are added to the two connecting bolts at both ends of the connecting plate, and soft copper wires are used for bridging between the bridge, and then the bridge is connected with the grounding wire to form an electrical path. There shall be at least two connections between the whole bridge and the grounding main line. Inspection and acceptance are required after the completion of grounding operation.
以上就是為大家介紹的有關山東電纜橋架的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯系我們.我們將以的態度,為您提供服務http://www.euup.cn
The above is a detailed introduction about Shandong cable tray, which I hope will be helpful to you If you have any questions, please contact us We will provide you with professional service http://www.euup.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 男人的天堂官网 | 欧美大尺度aaa级毛片 | 特黄大片aaaaa毛片 | 国产在线精品一区二区 | 亚洲aⅴ在线 | 国产精品黄网站 | 手机在线看a | 日韩欧国产精品一区综合无码 | 亚洲第一成人天堂第一 | 亚洲国产三级 | 国产成人亚洲精品一区二区在线看 | 黄色三级理沦片 | 亚洲精品91 | 在线观看欧美亚洲日本专区 | 久久久黄色片 | 18性欧美69 | 美女午夜色视频在线观看 | 毛片激情永久免费 | 免费视频一区二区 | 亚洲精品国产高清不卡在线 | 日本三级全黄三级a | 国产精品久久久久久免费播放 | 中文字幕一区二区三区视频在线 | 乱子伦xxxx | 99在线观看免费视频 | 亚洲精品国产拍拍拍拍拍 | 国产视频一区二区三区四区 | 欧美一级毛片不卡免费观看 | 久久久免费的精品 | 日韩免费一级a毛片在线播放一级 | 欧美日韩顶级毛片www免费看 | 久久久精品久久视频只有精品 | 日韩精品视频美在线精品视频 | 国产免费自拍视频 | 欧美一区二区在线播放 | chinese农村野战videos | 国产一区二区免费视频 | 免费国产一级 | 亚洲精品久久久久中文字幕一区 | 三级国产精品 | 91热久久免费频精品黑人99 |