成人免费片-成人免费动作大片黄在线-成人免费在线-成人免费在线网站-欧美亚洲在线观看-欧美亚洲在线视频

網站公告-NOTICE
聯系我們
濟南航豐實業有限公司

電話:15168870138
聯系人:龐經理

網址:http://www.euup.cn  

廠址: 德州市禹城市莒鎮產業園26棟

經銷商地址:天橋區建華五金市場東區5-1  

魯ICP備09095923號-1

新聞資訊

當前位置:首頁 / 新聞資訊

橋架安裝在不同場合如何接地

在我們使用橋架的過程中,根據其安裝的場合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?下面我們為您整理相關內容。
In the process of using the cable tray, the grounding methods are different according to the different installation occasions. Do you know what grounding methods are used? Now let's organize the relevant content for you.
在我們使用橋架的過程中,根據其安裝的場合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?
In the process of using the cable tray, the grounding methods are different according to the different installation occasions. Do you know what grounding methods are used?
橋架可能存在的安裝場合以及如何接地的情況有以下三種:
There are three possible installation occasions and grounding methods for cable tray:
1、當允許利用橋架系統構成接地干線回路時,橋架端部之間連接電阻應不大于0.00033歐姆 ,接地孔應絕緣涂層。在1KV及以下中性點直接接地系統中,受電設備的接地與系統中性線接地相連。
1. When the cable tray system is allowed to form the grounding trunk circuit, the connection resistance between cable tray ends shall not be greater than 0.00033 ohms, and the insulation coating shall be removed from the grounding hole. In the neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected with the system neutral line grounding.
2、裝有處動切斷供電裝軒時,橋架的級長方向金屬橫截面積應不小于規定值。沿橋架全長另敷設接地干線時,每段(包括非直線 段)橋架應少有一點與接地干線可靠連接。
2. When equipped with automatic cut-off power supply device, the metal cross sectional area of the cable tray in the level direction shall not be less than the specified value. When the grounding main line is laid along the full length of the bridge, at least one point of each section (including the non straight line section) of the bridge shall be reliably connected with the grounding main line.

橋架安裝在不同場合如何接地
How to ground the cable tray in different occasions
3、對于振動場所,橋架不同的安裝場合的接地要點說明:在接地部位的連接處應裝置彈簧圈。
3. Key grounding points for vibration places and different installation occasions of bridge: spring coil shall be installed at the connection of grounding parts.
電纜橋架之間可利用連接板作為跨接線,把橋架連成一體。在連接板兩端的兩只連接螺栓上加鍍鋅彈簧墊圈,橋架之間用軟銅線進行跨接,再將橋架與接地線相連,形成電氣通路。橋架整體與接地干線應有不少于兩處的連接。接地作業完成后需要檢查驗收。
Connecting plates can be used as jumpers between cable trays to connect them into a whole. Galvanized spring washers are added to the two connecting bolts at both ends of the connecting plate. Soft copper wires are used for bridging between bridges, and then the bridge is connected with the grounding wire to form an electrical path. There shall be at least two connections between the whole bridge and the grounding trunk. Inspection and acceptance are required after the grounding operation is completed.
以上就是為大家介紹的有關山東電纜橋架的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯系我們.我們將以的態度,為您提供服務http://www.euup.cn
The above is a detailed introduction of Shandong cable tray for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with our attitude http://www.euup.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 久久久久久91香蕉国产 | 欧美国产高清 | 亚洲一级视频在线观看 | 国产不卡在线视频 | 色www永久免费网站国产 | 国产在线视频一区二区三区 | 国产特级全黄一级毛片不卡 | 欧洲97色综合成人网 | 亚洲欧美国产18 | 免费狼人久久香蕉网 | 亚洲人成综合网站在线 | 不卡无毒免费毛片视频观看 | 欧美成人亚洲国产精品 | 亚洲国产精品久久久久久网站 | 国产精品亚洲第一区柳州莫青 | 久久久久久免费一区二区三区 | 国产久视频 | 欧美人成片免费看视频不卡 | 日韩午夜在线视频不卡片 | 中国人免费观看高清在线观看二区 | a级男女性高爱潮高清试 | 国产福利拍拍拍 | 99免费在线观看 | 亚洲精品区一区二区三区四 | 精品无人区一区二区三区a 精品午夜国产在线观看不卡 | 成年女人免费又黄又爽视频 | 成年人视频网站免费 | 国产成人精品福利网站在线 | 欧美在线视频一区二区 | 久久亚洲国产伦理 | 欧美在线香蕉在线现视频 | 日韩免费高清一级毛片 | 国产成人精品综合 | 免费手机黄色网址 | 男人的天堂精品国产一区 | 深夜成人性视频免费看 | 一级毛片免费观看不卡的 | 国产做a爰片久久毛片a | 国产成人免费在线视频 | 91久久精一区二区三区大全 | 国产精品免费大片一区二区 |