濟南電纜橋架防火規范的測試方法

電纜橋架防火規范的測試方法主要包括以下幾種:

The testing methods for fire prevention regulations of cable trays mainly include the following:

外觀檢查:用目視檢查和手感檢查的方式,查看橋架表面有無裂紋、變形、銹蝕、劃傷等缺陷,尤其要注意防火涂層是否有脫落、起皮、起泡等情況,以及橋架連接處是否緊密,連接螺栓有無松動,連接處的密封膠條是否完好。

Appearance inspection: Use visual inspection and tactile inspection to check for defects such as cracks, deformation, rust, scratches, etc. on the surface of the bridge, especially paying attention to whether the fireproof coating has peeled off, peeled off, foamed, etc., as well as whether the bridge connections are tight, whether the connecting bolts are loose, and whether the sealing strips at the connections are intact.

尺寸與厚度測量:使用卡尺、千分尺等工具測量電纜橋架的尺寸,確保尺寸精度符合標準。采用厚度測量儀測量橋架板材厚度以及防火涂層厚度,保證其滿足設計要求和相關標準。不同類型的防火電纜橋架對防火涂層厚度有相應規定,如涂層厚度一般應不小于 60μm。

Measurement of Dimensions and Thickness: Use tools such as calipers and micrometers to measure the dimensions of cable trays, ensuring that the dimensional accuracy meets the standards. Use a thickness measuring instrument to measure the thickness of the bridge plate and the thickness of the fireproof coating, ensuring that they meet the design requirements and relevant standards. Different types of fire-resistant cable trays have corresponding regulations on the thickness of fire-resistant coatings, such as coating thickness should generally not be less than 60 μ m.

20221114120604238.jpg

機械性能測試:包括撞擊試驗和機械載荷試驗。撞擊試驗是使用撞擊試驗機模擬實際工況,評估電纜橋架在受到撞擊時的抗沖擊能力和結構穩定性,要求橋架經撞擊試驗后不應出現影響使用的變形和裂紋。機械載荷試驗則是利用載荷試驗機模擬實際負載,檢測電纜橋架在承受一定機械負載時的性能,要求橋架在承受工作載荷時,其相對撓度值≤10,卸載后不應有明顯變形。

Mechanical performance testing: including impact testing and mechanical load testing. Impact testing is the use of an impact testing machine to simulate actual working conditions, evaluate the impact resistance and structural stability of cable trays when subjected to impact, and require that the trays should not exhibit deformation or cracks that affect safe use after impact testing. Mechanical load testing is the use of a load testing machine to simulate actual loads and test the performance of cable trays under certain mechanical loads. It is required that the relative deflection value of the tray should be ≤ 10 when subjected to safe working loads, and there should be no significant deformation after unloading.

表面防護層性能測試:通過涂層測厚儀測量表面防護層厚度,使用附著力測試儀進行表面防護層附著力試驗,以評估防護層在長期使用過程中是否會脫落;采用均勻性測試儀進行表面防護層均勻性試驗,確保防護層整體防腐和耐火性能良好。

Surface protective layer performance testing: Measure the thickness of the surface protective layer using a coating thickness gauge, and conduct adhesion tests on the surface protective layer using an adhesion tester to evaluate whether the protective layer will peel off during long-term use; Use a uniformity tester to conduct uniformity tests on the surface protective layer, ensuring that the overall anti-corrosion and fire resistance performance of the protective layer is good.

耐火等級試驗:這是電纜橋架防火規范測試的關鍵項目。試驗在特定的耐火試驗爐中進行,需使爐內少含有一個橋架接頭且有足夠的與實際使用情況相符的連接件,并確保實現四面受火。試驗過程中,要嚴格按照標準時間 - 溫度曲線升溫,即(其中t為爐內的平均溫度,單位為℃;

Fire resistance rating test: This is a key item in the fire protection specification testing of cable trays. The experiment is conducted in a specific fire-resistant testing furnace, which must have at least one bridge joint and sufficient connectors that match the actual usage situation, and ensure that all four sides are exposed to fire. During the experiment, the temperature should be strictly raised according to the standard time temperature curve, where t is the average temperature inside the furnace, measured in ℃;

為時間,單位為 min),同時控制爐內壓力。試驗開始后,按頻次要求及時對爐內溫度及壓力進行測量與記錄,隨時觀察 3A 熔斷器情況,當橋架內電纜泄漏電流達到 3A 時,表明該橋架已不能維持其內部電纜繼續工作,喪失耐火能力,此時即為橋架的維持工作時間。若試驗中橋架仍能維持其內部電纜正常工作,但試驗已達到預定的維持工作時間時,也可終止試驗。

For time, in minutes, while controlling the pressure inside the furnace. After the experiment begins, the temperature and pressure inside the furnace should be measured and recorded in a timely manner according to the frequency requirements, and the condition of the 3A fuse should be observed at any time. When the leakage current of the cables in the bridge reaches 3A, it indicates that the bridge can no longer maintain its internal cables and lose its fire resistance ability. At this time, it is the maintenance working time of the bridge. If the bridge can still maintain the normal operation of its internal cables during the test, but the test has reached the predetermined maintenance time, the test can also be terminated.

此外,對于一些有條件的場所,還可定期委托機構對防火電纜橋架進行的防火性能檢測,確保其防火性能符合相關標準。

In addition, for some places with conditions, professional organizations can be regularly commissioned to conduct comprehensive fire performance testing on fire-resistant cable trays to ensure that their fire performance meets relevant standards.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 欧美一级片免费 | 国产日本欧美高清免费区 | 三级国产在线 | 毛色毛片| 久草 在线 | 中文字幕在线精品 | 久久精品国产99国产精品 | 国产成人高清一区二区私人 | 八戒午夜精品视频在线观看 | 久久国产欧美日韩高清专区 | 欧美特黄一区二区三区 | 手机看片久久国产免费不卡 | 99在线视频精品 | 成人牲交一极毛片 | 波多野结衣中文无毒不卡 | 久久91精品国产91 | 日韩中文字幕精品久久 | 一级aaa毛片 | 最新国产午夜精品视频不卡 | 亚洲成人一区二区 | 国内成人精品亚洲日本语音 | 美女wc | 国产精品免费观看视频 | 欧美亚洲日本视频 | 日产乱码精品一二三区 | 成人国产精品999视频 | 亚洲精品一区二区三区在线看 | 亚洲成人免费观看 | 久久久香蕉视频 | 久久精品免费观看国产软件 | 精品国产免费久久久久久 | 精品国产综合成人亚洲区 | 一级特级欧美a毛片免费 | 亚洲毛片一级巨乳 | 国产精品1区2区3区 国产精品1区2区3区在线播放 | 丝袜足液精子免费视频 | 亚洲视频 欧美视频 | 手机免费黄色网址 | 九九视频只有精品六 | 精品一区二区三区亚洲 | 日韩一级欧美一级一级国产 |